Andes Drive Force Main Rehabilitation

Share Andes Drive Force Main Rehabilitation on Facebook Share Andes Drive Force Main Rehabilitation on Twitter Share Andes Drive Force Main Rehabilitation on Linkedin Email Andes Drive Force Main Rehabilitation link

The City of Fairfax Public Works Department plans to rehabilitate approximately 3,700 feet of aging sanitary sewer force main along Andes Drive. The eight-inch cast iron pipe conveys wastewater from homes to the Andes Drive pump station. A liner will be installed inside the pipe to extend the usable life expectancy of the pipe. This project will require some excavation in the right of way and a temporary above-ground sewer bypass. The project will begin in late April or early May and take about two months to complete.

Repairing and extending the life of critical wastewater infrastructure prevents failure, which could result in sanitary service disruptions, environmental harm, and more extensive repairs. This project follows the successful relining of the sanitary sewer force mains on Byrd Drive and San Juan Drive.

Spraying a New Pipe Liner
The city’s contractor, J. Fletcher Creamer & Son, Inc., will reline the inside of the pipe to extend its useful life expectancy. A small device pulled through the length of the pipe will spray a thin layer of epoxy that will harden and form a new lining. This method is more cost effective than full replacement and requires minimal excavation.

Pipe Interior Before ReliningPipe Interior After Relining

Minimal Excavation
The city has a maintenance easement on private property for accessing the force main. Excavation within this easement may occur to complete repairs to any section of force main pipe that cannot be lined. Some excavation in the right of way is required.

If necessary, a temporary sewer bypass will be installed to ensure residents’ wastewater service remains uninterrupted. The work may require short-term lane closures, and some areas may be coned off for several days.

The City of Fairfax Public Works Department plans to rehabilitate approximately 3,700 feet of aging sanitary sewer force main along Andes Drive. The eight-inch cast iron pipe conveys wastewater from homes to the Andes Drive pump station. A liner will be installed inside the pipe to extend the usable life expectancy of the pipe. This project will require some excavation in the right of way and a temporary above-ground sewer bypass. The project will begin in late April or early May and take about two months to complete.

Repairing and extending the life of critical wastewater infrastructure prevents failure, which could result in sanitary service disruptions, environmental harm, and more extensive repairs. This project follows the successful relining of the sanitary sewer force mains on Byrd Drive and San Juan Drive.

Spraying a New Pipe Liner
The city’s contractor, J. Fletcher Creamer & Son, Inc., will reline the inside of the pipe to extend its useful life expectancy. A small device pulled through the length of the pipe will spray a thin layer of epoxy that will harden and form a new lining. This method is more cost effective than full replacement and requires minimal excavation.

Pipe Interior Before ReliningPipe Interior After Relining

Minimal Excavation
The city has a maintenance easement on private property for accessing the force main. Excavation within this easement may occur to complete repairs to any section of force main pipe that cannot be lined. Some excavation in the right of way is required.

If necessary, a temporary sewer bypass will be installed to ensure residents’ wastewater service remains uninterrupted. The work may require short-term lane closures, and some areas may be coned off for several days.

Questions

loader image
Didn't receive confirmation?
  • Share Has this project started? If not, what is the new timeline? on Facebook Share Has this project started? If not, what is the new timeline? on Twitter Share Has this project started? If not, what is the new timeline? on Linkedin Email Has this project started? If not, what is the new timeline? link

    Has this project started? If not, what is the new timeline?

    Laura D asked 14 days ago

    Thank you for your question. We are still in the planning phase. The contractor has proposed an alternate bypass plan and rehab methods, both of which are under review. The current project timeline is to start work toward the end of April or early May. The project should be completed in less than 60 days from the start date.

Page last updated: 01 Apr 2025, 05:20 AM