About the Projects
These projects include construction of sidewalks and curb and gutter on the north side of First Street between Hallman Street and Oak Street, on the south side of Second Street between Walnut Street and Oak Street, and on the west side of Oak Street between Main Street an Willow Terrace. Sidewalks will improve pedestrian safety. Curb and gutter will contain stormwater runoff to the roadway and prevent it from flowing onto private property.
The Oak Street project was included in the city’s FY2022-23 Two-Year Transportation Program, adopted by the city council on June 22, 2021. The council then endorsed the application for state revenue sharing funding for Oak Street on September 28, 2021.
The First and Second Street project was included in the city’s FY2024-25 Two-Year Transportation Program, adopted by the council on June 13, 2023, and the council endorsed the funding application on September 12, 2023.
Funding became available and design was initiated for both projects in FY 2026. Construction is anticipated in 2028-2029.
First, Second, and Oak Street Sidewalks
Share your feedback! View the First and Second Street and Oak Street project exhibits and leave comments in the discussion forum at the bottom of this page. You may also provide feedback in person at the public hearing during the Fairfax City Council meeting at 7 p.m. on Tuesday, November 10, 2026.
About the Projects
These projects include construction of sidewalks and curb and gutter on the north side of First Street between Hallman Street and Oak Street, on the south side of Second Street between Walnut Street and Oak Street, and on the west side of Oak Street between Main Street an Willow Terrace. Sidewalks will improve pedestrian safety. Curb and gutter will contain stormwater runoff to the roadway and prevent it from flowing onto private property.
The Oak Street project was included in the city’s FY2022-23 Two-Year Transportation Program, adopted by the city council on June 22, 2021. The council then endorsed the application for state revenue sharing funding for Oak Street on September 28, 2021.
The First and Second Street project was included in the city’s FY2024-25 Two-Year Transportation Program, adopted by the council on June 13, 2023, and the council endorsed the funding application on September 12, 2023.
Funding became available and design was initiated for both projects in FY 2026. Construction is anticipated in 2028-2029.
Share In addition to the sidewalks, can there be additional safety measures we can take as a community to better protect our children and pedestrians, to make these areas safer? Such as: Pedestrian-activated crosswalk warning light systems that alert drivers when someone is crossing.
Motion-sensor activated warning lights to increase driver awareness and visibility.
The white stripped high-visibility crosswalk markings.
An example of this type of improvement can be seen at the recently installed crosswalk at Cedar and 123.
Could we consider similar safety measures along Oak and Walnut to help protect children and pedestrians who walks or bikes through our neighborhood?
Our children's safety should be a community priority. What steps can we take to get these types of safety features along those streets? on FacebookShare In addition to the sidewalks, can there be additional safety measures we can take as a community to better protect our children and pedestrians, to make these areas safer? Such as: Pedestrian-activated crosswalk warning light systems that alert drivers when someone is crossing.
Motion-sensor activated warning lights to increase driver awareness and visibility.
The white stripped high-visibility crosswalk markings.
An example of this type of improvement can be seen at the recently installed crosswalk at Cedar and 123.
Could we consider similar safety measures along Oak and Walnut to help protect children and pedestrians who walks or bikes through our neighborhood?
Our children's safety should be a community priority. What steps can we take to get these types of safety features along those streets? on X (formerly Twitter)Share In addition to the sidewalks, can there be additional safety measures we can take as a community to better protect our children and pedestrians, to make these areas safer? Such as: Pedestrian-activated crosswalk warning light systems that alert drivers when someone is crossing.
Motion-sensor activated warning lights to increase driver awareness and visibility.
The white stripped high-visibility crosswalk markings.
An example of this type of improvement can be seen at the recently installed crosswalk at Cedar and 123.
Could we consider similar safety measures along Oak and Walnut to help protect children and pedestrians who walks or bikes through our neighborhood?
Our children's safety should be a community priority. What steps can we take to get these types of safety features along those streets? on LinkedinEmail In addition to the sidewalks, can there be additional safety measures we can take as a community to better protect our children and pedestrians, to make these areas safer? Such as: Pedestrian-activated crosswalk warning light systems that alert drivers when someone is crossing.
Motion-sensor activated warning lights to increase driver awareness and visibility.
The white stripped high-visibility crosswalk markings.
An example of this type of improvement can be seen at the recently installed crosswalk at Cedar and 123.
Could we consider similar safety measures along Oak and Walnut to help protect children and pedestrians who walks or bikes through our neighborhood?
Our children's safety should be a community priority. What steps can we take to get these types of safety features along those streets? link
In addition to the sidewalks, can there be additional safety measures we can take as a community to better protect our children and pedestrians, to make these areas safer? Such as: Pedestrian-activated crosswalk warning light systems that alert drivers when someone is crossing.
Motion-sensor activated warning lights to increase driver awareness and visibility.
The white stripped high-visibility crosswalk markings.
An example of this type of improvement can be seen at the recently installed crosswalk at Cedar and 123.
Could we consider similar safety measures along Oak and Walnut to help protect children and pedestrians who walks or bikes through our neighborhood?
Our children's safety should be a community priority. What steps can we take to get these types of safety features along those streets?
1stSThmeofBYs
asked
10 days ago
Thank you for your question. High-visibility crosswalk markings are currently shown in the plans for crosswalks on Oak, Walnut, and Hallman. Rectangular Rapid Flashing Beacons (RRFBs), such as those at Chain Bridge Road and Cedar Avenue, are not recommended. Based on state and federal guidance, use of flashing beacons is generally limited to higher-volume roads and crossings to avoid reduced effectiveness from overuse. However, the project team will consider if there are other design modifications that can be made to help improve pedestrian visibility at crosswalks.
First, Second, and Oak Street Sidewalks has finished this stage
The city presented concept plans for the proposed improvements at an open house on March 22, 2023.
Public Outreach
First, Second, and Oak Street Sidewalks has finished this stage
The city seeks comments on the proposed concept plan.
City Council Endorsement 10-12-2023
First, Second, and Oak Street Sidewalks has finished this stage
City Council approved, unanimously, to adopt a resolution to endorse the city’s FY 27/28 Revenue Sharing Application for 1st/2nd Street Sidewalks and Dwight Avenue improvements.
First, Second, and Oak Street Sidewalks is currently at this stage
Public Hearing 11-10-2026
this is an upcoming stage for First, Second, and Oak Street Sidewalks
A public hearing is scheduled to be held during the November 10 City Council meeting. Drop by between 6-7 p.m. (before the meeting) to meet with project staff and learn more about the project.