The city has developed a concept plan for new sidewalks on Rust Road and Westmore Drive. The city council needs community input to determine whether this project should proceed. View the proposed plans.

The comment period for this project will be open until Oct. 30. To provide input:

  • Provide comments on the survey below.
  • Attend an open house on Tuesday, Oct. 20. Drop by City Hall (10455 Armstrong St.) anytime between 5-7 p.m. to learn more about this project and share your input in person.

About the Study

The City of Fairfax is evaluating the feasibility of constructing new sidewalks on the east side of Rust Road between Main Street and Westmore Drive, and on Westmore Drive between Rust Road and Fairfax Street. This proposed project would connect the existing sidewalks on Rust Road and Fairfax Street and provide a continuous sidewalk between the residential neighborhood and commercial destinations on Main Street. It would also provide stormwater drainage improvements and improve safety for all road users.

Residents on Rust Road and Westmore Drive submitted petitions to the city requesting new sidewalks on these streets. After receiving these petitions, the city conducted a high-level evaluation of the existing street and sidewalk network based on the Residential New Sidewalk Policy. This project was recommended for further study and approved by the Fairfax City Council in the FY 2026-2027 Two-Year Transportation Program.

The goals of the sidewalk feasibility study include:

  • Evaluate existing conditions such as available right-of-way, utility locations, and other conditions that may impact sidewalk design and cost
  • Develop preliminary concept design to identify potential conflicts and funding needs
  • Collect community feedback about the preliminary concept design

Study Status

This project is in the “Concept” phase, near the beginning of the development process, and subsequent phases have not been funded. This is a critical stage for community feedback. The city council needs input to determine whether this project should proceed. If there is consensus to proceed, the council may direct staff to seek funding for design and construction.

The city has developed a concept plan for new sidewalks on Rust Road and Westmore Drive. The city council needs community input to determine whether this project should proceed. View the proposed plans.

The comment period for this project will be open until Oct. 30. To provide input:

  • Provide comments on the survey below.
  • Attend an open house on Tuesday, Oct. 20. Drop by City Hall (10455 Armstrong St.) anytime between 5-7 p.m. to learn more about this project and share your input in person.

About the Study

The City of Fairfax is evaluating the feasibility of constructing new sidewalks on the east side of Rust Road between Main Street and Westmore Drive, and on Westmore Drive between Rust Road and Fairfax Street. This proposed project would connect the existing sidewalks on Rust Road and Fairfax Street and provide a continuous sidewalk between the residential neighborhood and commercial destinations on Main Street. It would also provide stormwater drainage improvements and improve safety for all road users.

Residents on Rust Road and Westmore Drive submitted petitions to the city requesting new sidewalks on these streets. After receiving these petitions, the city conducted a high-level evaluation of the existing street and sidewalk network based on the Residential New Sidewalk Policy. This project was recommended for further study and approved by the Fairfax City Council in the FY 2026-2027 Two-Year Transportation Program.

The goals of the sidewalk feasibility study include:

  • Evaluate existing conditions such as available right-of-way, utility locations, and other conditions that may impact sidewalk design and cost
  • Develop preliminary concept design to identify potential conflicts and funding needs
  • Collect community feedback about the preliminary concept design

Study Status

This project is in the “Concept” phase, near the beginning of the development process, and subsequent phases have not been funded. This is a critical stage for community feedback. The city council needs input to determine whether this project should proceed. If there is consensus to proceed, the council may direct staff to seek funding for design and construction.

  • The City of Fairfax has developed a concept for a sidewalk on the Rust Road between Main Street and Westmore Drive and on Westmore Drive between Rust Road and Fairfax Street. This proposed project would connect to the existing sidewalk on Fairfax Street and provide a continuous sidewalk between the residential neighborhood and commercial destinations. It would also provide stormwater drainage improvements and improve safety for all road users. 

    The Fairfax City Council needs community input to determine whether this project should proceed. If there is consensus to proceed, the council may direct staff to seek funding for design and construction of this project.

    If you have already submitted your comments at the open house, you do not need to complete this survey. 

    Take Survey
    Share Rust Road/Westmore Drive Sidewalk on Facebook Share Rust Road/Westmore Drive Sidewalk on X (formerly Twitter) Share Rust Road/Westmore Drive Sidewalk on Linkedin Email Rust Road/Westmore Drive Sidewalk link
Page last updated: 05 Oct 2026, 06:52 AM